杂志信息网-创作、查重、发刊有保障。

混凝土方面毕业论文外文翻译

发布时间:2024-07-08 02:46:34

混凝土方面毕业论文外文翻译

照片镶在一个橡木镜框里。增强实力,预计可在通常相当小,作为约束,是常见的,只有所提供的栏目,一般较为灵活。

building types and designA building is closely bound up with people,for it provides with the necessary space to work and live in .As classified by their use ,buildings are mainly of two types :industrial buildings and civil buildings .industrial buildings are used by various factories or industrial production while civil buildings are those that are used by people for dwelling ,employment ,education and other social activities .Industrial buildings are factory buildings that are available for processing and manufacturing of various kinds ,in such fields as the mining industry ,the metallurgical industry ,machine building ,the chemical industry and the textile industry . factory buildings can be classified into two types single-story ones and multi-story ones .the construction of industrial buildings is the same as that of civil buildings .however ,industrial and civil buildings differ in the materials used and in the way they are used .Civil buildings are divided into two broad categories: residential buildings and public buildings .residential buildings should suit family life .each flat should consist of at least three necessary rooms : a living room ,a kitchen and a toilet .public buildings can be used in politics ,cultural activities ,administration work and other services ,such as schools, office buildings, parks ,hospitals ,shops ,stations ,theatres ,gymnasiums ,hotels ,exhibition halls ,bath pools ,and so on .all of them have different functions ,which in turn require different design types as well. Housing is the living quarters for human beings .the basic function of housing is to provide shelter from the elements ,but people today require much more that of their housing .a family moving into a new neighborhood will to know if the available housing meets its standards of safety ,health ,and comfort .a family will also ask how near the housing is to grain shops ,food markets ,schools ,stores ,the library ,a movie theater ,and the community center .In the mid-1960’s a most important value in housing was sufficient space both inside and out .a majority of families preferred single-family homes on about half an acre of land ,which would provide space for spare-time activities .in highly industrialized countries ,many families preferred to live as far out as possible from the center of a metropolitan area ,even if the wage earners had to travel some distance to their work .quite a large number of families preferred country housing to suburban housing because their chief aim was to get far away from noise ,crowding ,and confusion .the accessibility of public transportation had ceased to be a decisive factor in housing because most workers drove their cars to work .people we’re chiefly interested in the arrangement and size of rooms and the number of bedrooms .Before any of the building can begin ,plans have to be drawn to show what the building will be like ,the exact place in which it is to go and how everything is to be important point in building design is the layout of rooms ,which should provide the greatest possible convenience in relation to the purposes for which they are intended .in a dwelling house ,the layout may be considered under three categories : “day”, “night” ,and “services” .attention must be paid to the provision of easy communication between these areas .the “day “rooms generally include a dining-room ,sitting-room and kitchen ,but other rooms ,such as a study ,may be added ,and there may be a hall .the living-room ,which is generally the largest ,often serves as a dining-room ,too ,or the kitchen may have a dining alcove .the “night “rooms consist of the bedrooms .the “services “comprise the kitchen ,bathrooms ,larder ,and water-closets .the kitchen and larder connect the services with the day rooms .It is also essential to consider the question of outlook from the various rooms ,and those most in use should preferably face south as possible .it is ,however ,often very difficult to meet the optimum requirements ,both on account of the surroundings and the location of the roads .in resolving these complex problems ,it is also necessary to follow the local town-planning regulations which are concerned with public amenities ,density of population ,height of buildings ,proportion of green space to dwellings ,building lines ,the general appearance of new properties in relation to the neighbourhood ,and so on .There is little standardization in industrial buildings although such buildings still need to comply with local town-planning regulations .the modern trend is towards light ,airy factory buildings .generally of reinforced concrete or metal construction ,a factory can be given a “shed ”type ridge roof ,incorporating windows facing north so as to give evenly distributed natural lighting without sun-glare .翻译:建筑类型和设计建筑物与人们有着紧密的联系,他为人们提供必要的空间,用以工作和生活。根据适用类型不同,建筑物可以分为两类:工业建筑和民用建筑。工业建筑包括各个工厂或工业生产所使用建筑,民用建筑是指那些人们用以居住,就业,教育和其他社会活动的建筑场所。工业建筑的厂房可用于采矿业,冶金工业,机械制造,化学工业和纺织工业等各类领域的加工和制造。厂房可分为两种类型:单层的和多层的。工业建筑也属于建筑的一种。但是,工业建筑与民用建筑所用的材料和建筑方式不同。民用建筑按使用可分为两大类:住宅建筑和公共建筑。住宅建筑要适应家庭生活。每个单位应包括至少三个必要客房:起居室,厨房和厕所。公共建筑可在政治,文化活动,管理工作和其他服务,如学校,写字楼,公园,医院,商店,车站,剧院,体育馆,宾馆,展览馆,洗浴池,等等。他们都有着不同的职能,这反过来又需要不同的设计类型。房屋是用以住人的. 其基本功能是提供住房的内容,但今天人们需要更多的住房内容。一个家庭在进入一个新的社区后将知道,现有住房不仅要符合其安全,健康和舒适等标准。还要考虑其附近是否有相应的配套设施,如食品市场,学校,商店,图书馆,电影院,以及社区中心等。在60年代中期住房最重要的价值是足够大的空间和方便的出入交通。大多数家庭会首选约半英亩面积土地的家庭住宅,这样将提供足够的空间的用以业余活动。在高度工业化的国家,许多家庭的首选是那种尽可能远离市中心商业圈的住房,即使距离上班地点不得不有一段距离。相当多的家庭首选是郊区的住房,因为他们的主要目的是要远离噪音,拥挤和混乱。拥有方便的公共交通使得距离不再是一个决定性因素,因为大多数人都是开着自己的汽车去上班了。人们现在主要感兴趣的是户型,房间的大小和卧室的数目。在工程项目开始之前,要做好建筑设计和施工流程,让人提前知道该建筑建成后是什么样子以及下一步应该做什么。在建筑设计中要特别重视房间的布局,其目的是提供最大的便利与可能的用途。在一个住宅建筑设计中,布局可考虑以下三个方面: “白天” , “夜晚”和“服务”。必须注意这些空间区域之间的连通交流。 “白天”房一般包括餐厅,起居室和厨房,但其他房间可能会增加,如书房,并有可能成为一个大厅。起居室通常是最大的,往往是一个餐厅,也或可能有厨房、凹室等。 “夜间”房间包括卧室、客房。“服务”用房间包括厨房,浴室,储藏室 ,和厕所等。厨房和储藏室需设置在一起,以方便其房间功能的使用。此外,还必须考虑各种客房的朝向问题,当然最好尽可能的将那些经常使用的房间朝南设置。然而,在考虑到周围的环境和地点、道路等多方面因素,往往很难达到最佳要求。在解决这些复杂的问题,还必须按照当地城市规划条例所涉及的对公共设施,人口密度,建筑物高度,绿化面积,建筑红线等的要求,还要考虑到有相邻建筑的情况,等等。尽管工业建筑需要符合当地城市规划条例但很少有标准化的工业楼宇。现代厂房建筑的趋势是轻质、通风。一般的钢筋混凝土结构或钢结构的工厂,可以得到一个“跌”型脊屋顶,把窗户开向北以便使分布均匀的自然采光不会直射进来造成刺眼。

BU HUI XIE YA

在桁条内加框的结构中,一般认为力度的增加作用总体来说是相当小的,因为抑制作用普遍是由柱子来提供的,而这种抑制作用总的来说相当有弹性的(灵活的)。累啊。。。。这是什么专业的句子?

混凝土论文文献英文翻译

Abstract: The good or bad quality of cement concrete has a great influence on the safety and costing of building structures, so the quality control of concrete in the course of construction must be given adequate attention, and the issues on the concrete quality control during construction shall be discussed. In terms of how to control concrete quality in projects, this article tries to discuss this issue based on the various aspects of concrete quality control, as well as the awareness of people on . The major factors affecting the strength of concrete;2. The relationship between the standard deviation and the grade and average strength of concrete;3. The rational control of raw material quality; 4. Scientific preparation of the concrete is a prerequisite of quality . Attach importance to the work at site laboratory;6. Concrete specimens passing qualification tests does not necessarily mean that the structural concretes are all qualified;7. Workability is a key deciding factor for concrete quality;8. Pouring and vibrating of concrete is a key link to quality;9. The essence of concrete quality control is the prevention of concrete defects;10. Concrete deformation occurred due to various factors must be given serious but not least, in order to guarantee the quality of concrete, quality awareness of people is just as important; at the same time, only with the concerted efforts of the designing institutions, the supervision units and the construction entities can the quality of cement concrete be ensured. Key words: constructions; cement concrete; building construction; quality control

Abstract: the quality of concrete structures of the safety of the structure, and therefore has a great influence on the cost in the construction of the concrete construction quality must be enough attention, mainly discussed how to control in the construction of the concrete problems. How to control the quality of concrete construction? This paper explores the quality control and from the concrete to the quality consciousness of people to talk about this problem. One, the main factors affecting concrete strength. Second, the concrete and the strength of concrete and the label of the average standard. Third, the reasonable control of raw materials. Four, science compound concrete is quality assurance prerequisites. Five, pay attention to the site of the lab work. Six, concrete specimens of concrete structures, not all qualified. 7 and workability of concrete quality is a major factor. Eight, the concrete process of fair-faced concrete quality is the key link. Nine, prevent defects are occurring in the quality control of key. Ten, concrete affected by various factors influence and deformation will cause enough attention. Finally, to ensure the quality of concrete quality consciousness, who is very important, and design and construction supervision unit, the unit can work together to ensure quality of : building the concrete construction quality control

白干估计是没有人干的

钢筋混凝土 素混凝土是由水泥、水、细骨料、粗骨料(碎石或;卵石)、空气,通常还有其他外加剂等经过凝固硬化而成。将可塑的混凝土拌合物注入到模板内,并将其捣实,然后进行养护,以加速水泥与水的水化反应,最后获得硬化的混凝土。其最终制成品具有较高的抗压强度和较低的抗拉强度。其抗拉强度约为抗压强度的十分之一。因此,截面的受拉区必须配置抗拉钢筋和抗剪钢筋以增加钢筋混凝土构件中较弱的受拉区的强度。 由于钢筋混凝土截面在均质性上与标准的木材或钢的截面存在着差异,因此,需要对结构设计的基本原理进行修改。将钢筋混凝土这种非均质截面的两种组成部分按一定比例适当布置,可以最好的利用这两种材料。这一要求是可以达到的。因混凝土由配料搅拌成湿拌合物,经过振捣并凝固硬化,可以做成任何一种需要的形状。如果拌制混凝土的各种材料配合比恰当,则混凝土制成品的强度较高,经久耐用,配置钢筋后,可以作为任何结构体系的主要构件。 浇筑混凝土所需要的技术取决于即将浇筑的构件类型,诸如:柱、梁、墙、板、基础,大体积混凝土水坝或者继续延长已浇筑完毕并且已经凝固的混凝土等。对于梁、柱、墙等构件,当模板清理干净后应该在其上涂油,钢筋表面的锈及其他有害物质也应该被清除干净。浇筑基础前,应将坑底土夯实并用水浸湿6英寸,以免土壤从新浇的混凝土中吸收水分。一般情况下,除使用混凝土泵浇筑外,混凝土都应在水平方向分层浇筑,并使用插入式或表面式高频电动振捣器捣实。必须记住,过分的振捣将导致骨料离析和混凝土泌浆等现象,因而是有害的。 水泥的水化作用发生在有水分存在,而且气温在50°F以上的条件下。为了保证水泥的水化作用得以进行,必须具备上述条件。如果干燥过快则会出现表面裂缝,这将有损与混凝土的强度,同时也会影响到水泥水化作用的充分进行。 设计钢筋混凝土构件时显然需要处理大量的参数,诸如宽度、高度等几何尺寸,配筋的面积,钢筋的应变和混凝土的应变,钢筋的应力等等。因此,在选择混凝土截面时需要进行试算并作调整,根据施工现场条件、混凝土原材料的供应情况、业主提出的特殊要求、对建筑和净空高度的要求、所用的设计规范以及建筑物周围环境条件等最后确定截面。钢筋混凝土通常是现场浇注的合成材料,它与在工厂中制造的标准的钢结构梁、柱等不同,因此对于上面所提到的一系列因素必须予以考虑。 对结构体系的各个部位均需选定试算截面并进行验算,以确定该截面的名义强度是否足以承受所作用的计算荷载。由于经常需要进行多次试算,才能求出所需的 3 截面,因此设计时第一次采用的数值将导致一系列的试算与调整工作。 选择混凝土截面时,采用试算与调整过程可以使复核与设计结合在一起。因此,当试算截面选定后,每次设计都是对截面进行复核。手册、图表和微型计算机以及专用程序的使用,使这种设计方法更为简捷有效,而传统的方法则是把钢筋混凝土的复核与单纯的设计分别进行处理。 土方工程 由于和土木工程中任何其他工种的施工方法与费用相比较,土方挖运的施工方法与费用的变化都要快得多,因此对于有事业心的人来说,土方工程是一个可以大有作为的领域。在1935年,目前采用的利用轮胎式机械设备进行土方挖运的方法大多数还没有出现。那是大部分土方是采用窄轨铁路运输,在这目前来说是很少采用的。当时主要的开挖方式是使用正铲、反铲、拉铲或抓斗等挖土机,尽管这些机械目前仍然在广泛应用,但是它们只不过是目前所采用的许多方法中的一小部分。因此,一个工程师为了使自己在土方挖运设备方面的知识跟得上时代的发展,他应当花费一些时间去研究现代的机械。一般说来,有关挖土机、装载机和运输机械的唯一可靠而又最新的资料可以从制造厂商处获得。 土方工程或土方挖运工程指的是把地表面过高处的土壤挖去(挖方),并把它倾卸到地表面过低的其他地方(填方)。为了降低土方工程费用,填方量应该等于挖方量,而且挖方地点应该尽可能靠近土方量相等的填方地点,以减少运输量和填方的二次搬运。土方设计这项工作落到了从事道路设计的工程师的身上,因为土方工程的设计比其他任何工作更能决定工程造价是否低廉。根据现有的地图和标高,道路工程师应在设计绘图室中的工作也并不是徒劳的。它将帮助他在最短的时间内获得最好的方案。 费用最低的运土方法是用同一台机械直接挖方取土并且卸土作为填方。这并不是经常可以做到的,但是如果能够做到则是很理想的,因为这样做既快捷又省钱。拉铲挖土机。推土机和正铲挖土机都能做到这点。拉铲挖土机的工作半径最大。推土机所推运的图的数量最多,只是运输距离很短。拉铲挖土机的缺点是只能挖比它本身低的土,不能施加压力挖入压实的土壤内,不能在陡坡上挖土,而且挖。卸都不准确。 正铲挖土机介于推土机和拉铲挖土机的之间,其作用半径大于推土机,但小于拉铲挖土机。正铲挖土机能挖取竖直陡峭的工作面,这种方式对推土机司机来说是危险的,而对拉铲挖土机则是不可能的。每种机械设备应该进行最适合它的性能的作业。正铲挖土机不能挖比其停机平面低很多的土,而深挖坚实的土壤时,反铲挖土机最适用,但其卸料半径比起装有正铲的同一挖土机的卸料半径则要小很多。在比较平坦的场地开挖,如果用拉铲或正铲挖土机运输距离太远时,则装有轮胎式的斗式铲运机就是比不可少的。它能在比较平的地面上挖较深的土(但只能挖机械本身下面的土),需要时可以将土运至几百米远,然后卸土并在卸土的过程中把土大致铲平。在挖掘硬土时,人们发现在开挖场地经常用一辆助推拖拉机(轮式或履带式),对返回挖土的铲运机进行助推这种施工方法是经济的。一旦铲运机装满,助推拖拉机就回到开挖的地点去帮助下一台铲运机。 斗式铲运机通常是功率非常大的机械,许多厂家制造的铲运机铲斗容量为8 m³,满载时可达10 m³。最大的自行式铲运机铲斗容量为19立方米(满载时为25 m³),由430马力的牵引发动机驱动。 翻斗机可能是使用最为普遍的轮胎式运输设备,因为它们还可以被用来送混凝土或者其他建筑材料。翻斗车的车斗位于大橡胶轮胎车轮前轴的上方,尽管铰接式翻斗车的卸料方向有很多种,但大多数车斗是向前翻转的。最小的翻斗车的容量大约为立方米,而最大的标准型翻斗车的容量大约为³。特殊型式的翻斗车包括容量为4 m³的自装式翻斗车,和容量约为 m³的铰接式翻斗车。必须记住翻斗车与自卸卡车之间的区别。翻斗车车斗向前倾翻而司机坐在后方卸载,因此有时被称为后卸卡车。 结构的安全度 规范的主要目的是提供一般性的设计原理和计算方法,以便验算结构的安全度。就目前的趋势而言,安全系数与所使用的材料性质及其组织情况无关,通常把它定义为发生破坏的条件与结构可预料的最不利的工作条件之比值。这个比值还与结构的破坏概率(危险率)成反比。 破坏不仅仅指结构的整体破坏,而且还指结构不能正常的使用,或者,用更为确切的话来说,把破坏看成是结构已经达到不能继续承担其设计荷载的“极限状态”。通常有两种类型的极限状态,即: (1)强度极限状态,它相当于结构能够达到的最大承载能力。其例子包括结构的局部屈曲和整体不稳定性;某此界面失效,随后结构转变为机构;疲劳破坏;引起结构几何形状显著变化的弹性变形或塑性变形或徐变;结构对交变荷载、火灾和爆炸的敏感性。 (2)使用极限状态,它对应着结构的使用功能和耐久性。器例子包括结构失稳之前的过大变形和位移;早期开裂或过大的裂缝;较大的振动和腐蚀。 根据不同的安全度条件,可以把结构验算所采用的计算方法分成: (1)确定性的方法,在这种方法中,把主要参数看作非随机参数。 (2)概率方法,在这种方法中,主要参数被认为是随机参数。此外,根据安全系数的不同用途,可以把结构的计算方法分为: (1)容许应力法,在这种方法中,把结构承受最大荷载时计算得到的应力与经过按规定的安全系数进行折减后的材料强度作比较。 (2)极限状态法,在这种方法中,结构的工作状态是以其最大强度为依据来衡量的。由理论分析确定的这一最大强度应不小于结构承受计算荷载所算得的强度(极限状态)。计算荷载等于分别乘以荷载系数的活载与恒载之和。 把对应于不乘以荷载系数的活载和恒载的工作(使用)条件的应力与规定值(使用极限状态)相比较。根据前两种方法和后两种方法的四种可能组合,我们可以得到一些实用的计算方法。通常采用下面两种计算方法: 确定性的方法,这种方法采用容许应力。 概率方法,这种方法采用极限状态。 至少在理论上,概率法的主要优点是可以科学的考虑所有随机安全系数,然后将这些随机安全系数组合成确定的安全系数。概率法取决于: Reinforced Concrete Plain concrete is formed from a hardened mixture of cement ,water ,fine aggregate, coarse aggregate (crushed stone or gravel),air, and often other admixtures. The plastic mix is placed and consolidated in the formwork, then cured to facilitate the acceleration of the chemical hydration reaction lf the cement/water mix, resulting in hardened concrete. The finished product has high compressive strength, and low resistance to tension, such that its tensile strength is approximately one tenth lf its compressive strength. Consequently, tensile and shear reinforcement in the tensile regions of sections has to be provided to compensate for the weak tension regions in the reinforced concrete element. It is this deviation in the composition of a reinforces concrete section from the homogeneity of 答题实属不易,请楼主谅解,求采纳~

关于混凝土方面的毕业论文

[论文关键词]现浇混凝土结构裂缝 原因 防治[论文摘要]现浇钢筋混凝土结构裂缝是施工中一个带有普遍性的问题。它不仅有损外观整体性,降低刚度。所以很有必要对裂缝进行鉴别、分析和控制。一、钢筋混凝土现浇结构收缩裂缝为保证操作需要的稠度,混凝土加入的水分往往比水泥水化作用需要的水分多4~5倍,这部分多余的水蒸发后会产生体积收缩,一般称为湿度收缩。另外水泥水化作用也会引起体积收缩,称为自收缩。施工中常见的混凝土收缩有塑性收缩裂缝、沉降收缩裂缝、干燥收缩裂缝。(一)塑性收缩裂缝一般出现在干热或刮风天气,形状像干燥泥浆面。裂缝多为中间宽两端渐细且长短不一、互不连贯。产生的主要原因是混凝土在塑性状态时表面水分蒸发过快,产生了急剧的体积收缩,从而导致混凝土表面裂缝。而蒸发速度的快慢和风速、相对湿度、混凝土表面空气湿度以及自身的温度有关。风速越大,温度越高,水分蒸发速度越快。防止产生这种裂缝的有效方法是:尽可能减少混凝土表面与内部的相对体积变化的差异。混凝土浇灌后及时覆盖,洒水养护;严格控制混凝土配合比;将基层和模板浇水均匀湿透;对高温、大风天气施工的混凝土应及时抹压,防止裂缝继续产生。(二)沉降收缩裂缝多沿主筋通长方向上在混凝土表面断续出现。或在相邻断面显著变化部位出现,裂缝较浅较宽。常在混凝土浇灌后发生、硬化后停止。产生的原因为混凝土浇捣后骨料颗粒沉落,水分上升,受到钢筋或埋设件或大的粗骨料阻挡,而使混凝土互相分离,或混凝土本身组成材料沉落不均造成开裂,斜面上的混凝土由于重力向下流动而开裂。为防止这类裂缝,可采用稠度适当的低流动性混凝土加强捣实;对断面相差较大的结构物先浇深部位2~3 h后再与薄断面一起浇灌。(三)干燥收缩裂缝多发生在混凝土终凝前后。裂缝为表面的,较浅较细,沿短向分布。随着湿度和气温的变化,由表及里,由大到小逐渐发展。产生的原因主要是混凝土养护不到位,风吹日晒,表面水分散失过快而内部湿度变化小,表面干缩变形受内部混凝土的约束,产生较大的拉应力而引起裂缝。为防止这类裂缝,可采取严格控制混凝土的水灰比、砂率、砂石含泥量;加强早期覆盖和养护适当延长养护时间;密封保水养护对长期露天堆放的构件采取适当洒水养护。二、温度裂缝混凝土受温度影响,会产生热胀冷缩变形。当变形变化不均受到约束,便会产生应力导致裂缝。(一)内约束裂缝由于混凝土内外温差过大引起的。从理论上计算,混凝土表面温度骤降超过5~7度就有可能引起裂缝。多发生在早期,通常只在混凝土表面出现。控制这类裂缝的方法,在于控制混凝土内外温差,防止表面急剧冷却,冬季采取保温、缓拆模;加热养护严格控制升降温度速度,温差不大于10度。(二)外约束裂缝由于平均降温过大引起的。大体积混凝土浇灌后,硬化期间水泥放出大量水化热,内部温度上升很高,散热慢,表面散热快,内外温差在表面引起拉应力;后期降温冷却时,当受到其他约束,又会在内部出现拉应力,当应力超过混凝土抗拉强度时,便出现裂缝。控制这类裂缝的方法有采用低热水泥;改善骨料级配;拌合水掺冰屑,对砂石冷却;合理安排工序进行薄层浇灌;预留孔洞;合理分缝分块。三、沉降裂缝多为深进的或贯穿性的,其位置与深陷方向一致,较大的沉陷裂缝往往有一定错位,裂缝宽度与沉降值成比例。产生的原因是结构构件落在未经加强处理的回填土或松软地基上,混凝土浇灌后,因地基浸水引起不均匀沉降而导致裂缝,特别是平卧生产的薄形构件。再有模板刚度不够,支撑间距过大或底部松动以及拆模过早,也常导致这类裂缝。 控制这类裂缝方法是,避免直接在松软土上制作构件;保证模板有足够刚度和强度,支撑牢固;作好周围排水,防止浸泡地基;拆模时间和顺序要按规定进行。四、地基不均匀沉降产生的裂缝由于地基沉降不均匀引起梁板裂缝。不均匀沉降产生的裂缝多属贯穿性裂缝,其走向与沉降情况有关,一般表现为垂直或是呈30~40°角方向发展。防止这类裂缝产生的方法是,地基必须进行认真勘测,充分掌握地基下的土质特征,如果遇到软弱土层,应对地基进行处理,保证地基满足设计要求,同时还应当注意基础周围的排水情况,防止地面水浸泡基础下的土层。五、结束语为了尽可能防止混凝土结构裂缝产生,需要不断提高设计施工质量,把好原材料质量关,采取有效措施,提高混凝土结构的耐久性,加强对建筑物的使用管理,避免随意增加荷栽,莫忘经常性的维护和维修工作,以延长建筑物的使用寿命。参考文献:[1]《建筑工程常见病多发病防治》,河南科学技术出版社.[2]金毳鸣,《浅谈钢筋混凝土楼板的裂缝产生原因和防治措施》.

摘要:三峡主体工程的混凝土总量达2800万m3,其中大坝混凝土约2000万m3。大坝混凝土施工是三峡工程能否按照总进度的要求达到计划目标的关键。根据总进度安排,其年最高浇筑量要达到500万m3,月最高要达到40万m3,日最高应达到万m3以上。经过对施工手段的多方案比较分析,在充分论证的基础上,决定选用以塔式皮带机连续输送浇筑为主,辅以大型门塔机和缆机的综合施工方案。在仓面工艺设计中,采用了平浇法和台阶法,同时,改革传统工艺,提出并运用塔(顶)带机新工艺。 关键词:混凝土;快速施工;方案及工艺;三峡工程 Abstract: The main body of the Three Gorges project concrete total of 28,000,000 m3, one of the concrete dam of about 20,000,000 m3. Concrete construction is the Three Gorges Dam project can progress in accordance with the requirements of the overall plan to achieve the key objectives. According to the progress of the total, in its capacity to achieve the highest placement 5,000,000 m3, to achieve the highest on 400,000 m3, and Japan should meet the highest for more than 20,000 m3. After the construction of more than a means of a comparative analysis of the program, with full proof on the basis of the decision to choose transmission tower belt machine pouring in a row, supplemented by a large gate tower and cable machine comprehensive construction plan. On deck in the design process using a water-level law and law at the same time, the reform of traditional crafts, and made use of towers (top) with the new machine technology. Key words: concrete; rapid construction; programs and technology; the Three Gorges Project

混凝土方面的论文格式

混凝土养护技术论文篇二 对混凝土养护技术的探讨 [摘 要]随着社会的发展,我国的工程项目日益增多,而混凝土作为工程项目中必不可少的材料之一,在工程项目施工中有着很大的作用。不过在工程施工中,混凝土的质量也直接影响着整个工程的质量。因此,为了避免这样的情况发生,我们在进行工程施工时,都会对混凝土进行一定的养护工作以保证混凝土的质量。 文章 通过对混凝土的养护的原理和方法进行简要的概述, 总结 了当前混凝土养护的技术,以供大家参考。 [关键词]混凝土;养护;介质温度;介质湿度;延续时间 中图分类号:TU154 文献标识码:A 文章编号:1009-914X(2016)07-0271-01 目前,由于混凝土已经广泛的应用到人们生活的各个方面,传统的工艺技术已经完全不能满足人们的需求,因此施工工艺和养护技术还需要不断创新,尤其是混凝土的养护技术,作为工程施工和质量保证的重要环节,它的创新直接影响着整个混凝土工艺技术。 一、混凝土养护原理 在混泥土的施工工艺中,当混凝土浇筑完后,还存在一个相当久的缓冲时期,需要相当长的一段时间保持混凝土的温度和湿度,这样才能很好的保障混凝土的强度与其质量的好坏,而我们就把保持混凝土中的温度与湿度的技术方法叫做混凝土的养护技术。由此可见,要做好混凝土的养护工作,必须要保证温度、湿度和养护时间这三大要素。 我们在进行混凝土的养护时,想要混凝土的硬度和强度得到增长,我们就必须要把握好混凝土内部的适当的温度和足够的湿度,这主要是和混凝土中重要组成的材料水泥有关,因为水泥是一种具有较强水硬性的材料,在与水反应的时候,会产生凝胶状的水化物,当这种水化物凝固后硬度和强度都会变得很大,不过这需要一定的条件,如果条件不能满足,还直接影响混凝土,使其出现裂痕。因此,我们在进行混凝土的养护时一定要注意混凝土中的温度和湿度,这样才能很好的保障混凝土的质量,才能用于工程施工。 二、养护方法 养护的方法有很多,比如:自然养护、标准养护、蓄热法养护等等,这些都可以对混凝土起到一个很好的养护作用,下面我们就对这些养护方法进一一的介绍。 1自然养护 混凝土的自然养护是施工工程中常见的养护方法之一,这主要是因为这种养护方法简便快捷,而且需要的成本很低,所以在工程施工中广泛的用于中、小型施工工程。这种方法应用的原理是,当在气温不低于5度的自然条件下,人们在混凝土的养护过程中采用浇水保湿,用其他的设施进行防风防干来对混凝土进行养护,以保证其质量。人们在进行养护的时候,都会采用像湿麻袋、锯末、湿砂等覆盖在混凝土的表面,然后在进行定期的洒水、浇水,以保持混凝土表面的湿度,而且在洒水时,一定要洒均匀,不然就很难保证混凝土中的湿度,而且在不同的季节,还要采用不同的方法,例如在春季, 雨水 比较充足,我们就要采取一定的防潮措施,以免因混凝土中的水分过多而引起的质量问题;在夏季的时候,我们为了防止其表面的温度过高,我们就要采取一定的隔热措施,将温度和湿度控制在合适的位置上,而且不同的混凝土的养护时间也存在着不同。因此,我们在采用自然养护时,一定要进行合理的控制。 2、标准养护 就是按规范要求,在温度20±3℃、相对湿度在90 %以上的条件下进行养护 ,即为标准养护。尤其是对混凝土试件进行标准养护,是测定混凝土强度的关键。 3、蓄热法养护 混凝土在养护期间采用保温材料加以覆盖 ,使混凝土始终保持一定温度。这种方法在平均气温不低于-10℃、混凝土表面率(表面积与体积比)小于5时较为适宜。多在住宅冬季施工中应用 ,若配合热水养生效果更佳。 4、热养护 热养护是利用外界热源加热混凝土而加速水泥水化反应的方法 ,也称加速硬化养护法。此法又分为以下几种: 4、1加热养护。此法往往在蓄热法养护达不到目的时采用。可分为暖棚法、 蒸汽加热法、 干 ― 湿法、 加压蒸汽法等。 (1)暖棚法。利用保温材料搭成暖棚 ,把整个构件或结构围起来 ,保证棚内有较高温度 ,棚内加热可采用装设蒸汽管 ,也可直接生火炉提高棚内温度。 (2)蒸汽加热法,也叫湿热法。利用蒸气加热,使混凝土得到较高温度和湿度,在湿热环境中加速水泥水化来达到加速硬化的目的。蒸汽养护分4个阶段进行,即预养期(静停期)、升温期、恒温期与降温期。为了防止和抑制结构破坏,在开始升温之前,要设置预养期,使混凝土在常温潮湿环境中静停(静置)一定时间,产生一定的早期强度。预养期以2~4h为宜。混凝土的结构破坏主要发生在升温期。同时,升温期也是混凝土结构的定型阶段,在热养过程中至关重要。在升温期必须控制升温速度,使因温度引起的不均匀膨胀破坏力不超过已产生的结构强度。对于中等强度的混凝土,升温速度不宜超过20~25℃/h。当升温达到最高限时,保持一段时间称为恒温期。恒温期是混凝土强度的主要增长期,故为混凝土结构的巩固期。恒温期混凝土的硬化速度取决于水泥品种、水灰比和恒温温度。对于普通硅酸盐水泥混凝土,恒温温度不宜超过60~70℃,矿渣硅酸盐水泥混凝土则不宜超过90~95℃,温度过高不利于水化作用,强度将会降低。目前,多采用恒温时间为3~5h。降温阶段因混凝土已具有较高强度能够承受较大的温度变化,为了避免表面开裂,一般脱模时气温与混凝土表面温度相差不得超过40℃,混凝土降温速度不宜超过35℃/h,过速降温不仅强度损失,而且失水过多将影响后期水化。对于尺寸大,外形复杂的构件,升降温速度应酌量减小。[1] (3)干湿热养护法与其他的养护方法不同,在混凝土浇筑成型后不需要延长养护期,直接利用其内部结构的饱和蒸汽养护产生的应力,就可以上混凝土中的温度和湿度达到一个合理的环境,而且这样的方法可以有效的控制混凝土的强度。它主要的施工原理是,在混凝土成型后的一段时间中,进行干燥,然后在进行高温养护。这样主要是因为,在进行高温养护的时候,内部的水分会因为高温的影响向外迁移,而内部就会因为脱水而进行收缩,从而使得混凝土内部更加紧密,而且有效的控制温度,也有效的控制了混凝土因高温而被破坏的现象。 4、2 辐射热养护法。 此法分为以下两种。 (1)太阳能热养护法。在混凝土表面覆盖一层吸热物体 ,搭设通光集热保温罩进行的混凝土养护。此法与自然养护比较 ,可缩短养护周期1/2左右,晴天集热罩内温度比室外温度高015~110倍。此法有直接覆盖、 太阳能养护罩 ,塑料簿膜简易暖棚等多种方式。[2] (2)红外线养护法。红外线加热养护就是利用发热体改变表面状态提高辐射强度,使被加热制品吸收辐射热提高内部温度。另外模板和介质也吸收热量,最终以对流和传导的方式再次传递给制品一部分,使制品内部温度进一步提高,加速水泥水化,促进混凝土内部结构的形成。此法是在发热体(散热器)表面涂刷远红外辐射材料,当发热体使涂料分子受热后便激发而向四周发射电磁波,该波被物体吸收,成为分子运动动能,使被加热物体的温度上 升。红外线加热以电、煤气或蒸气为热源。由于混凝土在养护过程中内部有游离水存在,而对红外线又有较宽广的吸收带,混凝土在60~100℃时对红外线的吸收率为90%左右。因此用远红外线加热养护混凝土制品可以取得混凝土内部温度高、养护时间短、抗压强度高,节约能源等效果。 结束语 由此可见,混凝土的养护技术在生活多种多样,而且在不同的环境下也有着不同的技术方案,这也有效的保障了混凝土的质量,同时也为我国的工程质量提供了一份保障。不过,由于我国在混凝土的养护技术方面起步比较晚,在很多方面还存在的不足,因此我们还要向发达国家多多学生,在以后的实践中,找到更加合理的施工技术,从而促进我国工程项目的发展与进步。 参考文献 [1] 黄云海.水泥混凝土强度应注意的几个影响因素[J].大众科技. 2004(10). [2] 彭仕国,尹友良,焦云州.混凝土养护工艺应用[J].铁道工程学报. 2001(02). 看了“混凝土养护技术论文”的人还看: 1. 公路养护技术论文 2. 公路养护技术论文(2) 3. 建筑节能新技术论文 4. 浅析水泥混凝土路面破坏的形式及裂缝养护 5. 浅谈工程技术建设论文

土木工程专业的英文论文格式

导语:土木工程专业的英文的论文格式包括哪些内容呢?土木工程是建造各类工程设施的科学技术的统称。下面是我分享的土木工程专业的英文的论文格式,欢迎阅读!

土木工程专业的英文论文格式均以美国土木工程师协会出版社发布的标准格式为准。

英语论文用激光打印机打印,打印稿为黑白稿,彩色打印件会影响出版效果。

版心:a4纸,上、下页边距 cm,左、右页边距均为 mm。论文内容宽不得超过, 长不得超过。

字体和字号:正文,标题,作者联络信息和图表中的文字均为times new roman 12号字。可以跟据需要使用同类字体中的粗体,斜体。

行距:单倍行距。

页码: 论文正文和文后所附图例都需添加页码。页码为阿拉伯数字,位于页面下方居中。

文体: 文章应语法正确,技术用词准确。标题应该以最简洁的语言概括文章内容。如果标题较长,请采用title: subtitle的形式。

数学公式:文中的数学公式不得手写,必须打印。公式如果在文中多次被引用,应该编号。公式之间,公式和正文之间都应该空一行。 单位: 文中所用的度量衡单位应为国际单位。可在括号内,单位对应表中列出其他单位。有关国际单位的使用(standard practice for use of the international system of units)可以通过电话1-向asce索取。其他相关使用参考文献,如anmc metric editorial guide, 5th ed,1992 可向美国国家公制协会 索取(american national metric council, 1735n. lynn street, suite 950, arlington, va 22209-2022)

图表:

标题说明和图例:插入的图表应该以出现顺序编号(figure 1,figure 2,table 1,table 2)。图的说明和标题,包括图的序号应该位于图的下方。表的说明和标题,包括表的序号应该位于表格上方。

位置: 图可以插入到正文中,或者集中放在文章最后。如果在正文中插入图,尽量放在页面的.顶部或尾部。不要选择文字环绕图形的对齐方式,可选择上下环绕方式。

底纹: 插图中不要选择带阴影或底纹,否则会影响印刷效果。

照片:如果文中需要附上照片,在文中出现照片的地方贴上其黑白光面冲洗照片,标题说明位于照片下方。照片将和正文一起缩印,请不要提供彩色照片,以免影响印刷效果。

扫描图: 印刷后的扫描图不如原件清晰。如果文中有扫描图,请提供灰色色标扫描图。

作者联络信息:请用横线和正文隔开。联络信息可以为一位作者或所有作者的,包括以下内容:作者全名;所属学会;学历或授予的荣誉;所在单位;通讯地址和电子邮箱;电话和传真。

参考文献: 所有参考文献为单倍行距,放在文章最后,按照第一作者姓氏的字母顺序排列。如有同一作者的两篇以上文献,按出版年代先后排列。正文中引用参考文献时,作者和出版年代应该放入括号内。由于上标缩印后会变小,难于辨认,正文中不使用上标标注参考文献。所列出的参考文献应当在正文中都有所引用,如果正文中没有引用,请将文献列入文章最后的附加信息(additional information)部分,或者相关材料(related materials)部分。

1.《建筑结构制图标准》GB/T50105-2001

2.《建筑结构荷载规范》GB5009-2001(2006版)

3.《混凝土结构设计规范》GB50010-2002

4.《建筑地基基础设计规范》GB5007-2002

5.《砌体结构设计规范》GB5003-2001

6.《建筑抗震设计规范》GB5011-2001

7.《钢结构设计规范》GB50017-2003

8.《建筑结构构造资料》(合订本),中国建筑工业出版社,1998年。

9.《混凝土结构构造手册》,中国建筑工业出版社,2002年。

10.《地基基础设计手册》,上海科技出版社,1998年。

11.《混凝土结构设计手册》,中国建筑工业出版社,2002年。

12.《建筑结构静力计算手册》,中国建筑工业出版社,1999年

13.《建筑结构强制性国家标准》(简装本),中国建筑工业出版社,2001年9月

14. 任全宏、常建军.钢筋混凝土多层框架结构房屋结构设计中应注意的几个问题。陕西建筑2007,145(7).

15. 范俊梅. 钢筋混凝土多层框架结构设计问题分析. 科技资讯2008,3.

16. Basic Principles for Reinforced Concrete Structure Design

17.建筑、结构设计有关图集资料以及专业课程教材等。

混凝土斜屋面毕业论文

毕业论文~大体积混凝土施工 班级: 学号: 姓名:目录一、施工方案的合理选择……………………………………………………1二、连续浇捣混凝土时在拌合及运输方面应采取的措施…………………………….2三、在施工过程中钢筋工程及模板工程的质量控制………………………………..2四、外加剂的合理选择………………………………………………………………..6五.高温条件下的混凝土浇筑质量……………………………………………………6大体积混凝土施工中的质量控制摘要:大体积混凝土的施工技术要求较高,特别在施工中要防止混凝土因水泥水化热引起的温度差产生温度应力裂缝。因此需要从材料选择上、技术措施等有关环节做好充分的准备工作,才能保证大体积混凝土顺利施工。 关键词:大体积混凝土 施工方案 高温条件 钢筋模板一、施工浇筑方案的选择:大体积混凝土的施工技术要求比较高,特别在施工中要防止混凝土因水泥水化热引起的温度差产生温度应力裂缝。因此需要从材料选择上、技术措施等有关环节做好充分的准备工作,才能保证大体积混凝土顺利施工。1、 材料选择本工程采用商品混凝土浇筑。对主要材料要求如下:(1)水泥:考虑普通水泥水化热较高,特别是应用到大体积混凝土中,大量水泥水化热不易散发,在混凝土内部温度过高,与混凝土表面产生较大的温度差,使混凝土内部产生压应力,表面产生拉应力。当表面拉应力超过早期混凝土抗拉强度时就会产生温度裂缝,因此确定采用水化热比较低的矿渣硅酸盐水泥,标号为525#,通过掺加合适的外加剂可以改善混凝土的性能,提高混凝土的抗渗能力。(2)粗骨料:采用碎石,粒径5-25mm,含泥量不大于1%。选用粒径较大、级配良好的石子配制的混凝土,和易性较好,抗压强度较高,同时可以减少用水量及水泥用量,从而使水泥水化热减少,降低混凝土温升。(3)细骨料:采用中砂,平均粒径大于,含泥量不大于5%。选用平均粒径较大的中、粗砂拌制的混凝土比采用细砂拌制的混凝土可减少用水量10%左右,同时相应减少水泥用量,使水泥水化热减少,降低混凝土温升,并可减少混凝土收缩。(4)粉煤灰:由于混凝土的浇筑方式为泵送,为了改善混凝土的和易性便于泵送,考虑掺加适量的粉煤灰。按照规范要求,采用矿渣硅酸盐水泥拌制大体积粉煤灰混凝土时,其粉煤灰取代水泥的最大限量为25%。粉煤灰对水化热、改善混凝土和易性有利,但掺加粉煤灰的混凝土早期极限抗拉值均有所降低,对混凝土抗渗抗裂不利,因此粉煤灰的掺量控制在10以内,采用外掺法,即不减少配合比中的水泥用量。按配合比要求计算出每立方米混凝土所掺加粉煤灰量。。2、混凝土配合比(1)混凝土采用搅拌站供应的商品混凝土,因此要求混凝土搅拌站根据现场提出的技术要求,提前做好混凝土试配。(2)混凝土配合比应提高试配确定。按照国家现行《混凝土结构工程施工及验收规范》、《普通混凝土配合比设计规程》及《粉煤灰混凝土应用技术规范》中的有关技术要求进行设计。(3)粉煤灰采用外掺法时仅在砂料中扣除同体积的砂量。另外应考虑到水泥的供应情况,以满足施工的要求。二、连续浇捣混凝土时在拌合及运输方面应采取的措施1、混凝土浇筑(1)混凝土采用商品混凝土,用混凝土运输车运到现场,每区采用2台混凝土输送泵送筑。(2)混凝土浇筑时应采用“分区定点、一个坡度、循序推进、一次到顶”的浇筑工艺。钢筋泵车布料杆的长度,划定浇筑区域,每台泵车负责本区域混凝土浇筑。浇筑时先在一个部位进行,直至达到设计标高,混凝土形成扇形向前流动,然后在其坡面上连续浇筑,循序推进。这种浇筑方法能较好的适应泵送工艺,使每车混凝土都浇筑在前一车混凝土形成的坡面上,确保每层混凝土之间的浇筑间歇时间不超过规定的时间。同时可解决频繁移动泵管的间题,也便于浇筑完的部位进行覆盖和保温。(3)混凝土浇筑时在每台泵车的出灰口处配置1~2台振捣器,因为混凝土的坍落度比较大,在米厚的底板内可斜向流淌1米远左右,2台振捣器主要负责下部斜坡流淌处振捣密实,另外2~4台振捣器主要负责顶部混凝土振捣。(4)由于混凝土坍落度比较大,会在表面钢筋下部产生水分,或在表层钢筋上部的混凝土产生细小裂缝。为了防止出现这种裂缝,在混凝土初凝前和混凝土预沉后采取二次抹面压实措施。(5)现场按每浇筑100立方米(或一个台班)制作3组试块,1组压7d强度,1组压28d强度归技术档案资料用;l组作仍14d强度备用。三、在施工过程中钢筋工程及模板工程的质量控制根据平面控制网,在防水保护层上放出轴线和基础墙、柱位置线;每跨至少两点用红油漆标注。顶板混凝土浇筑完成,支设竖向模板前,在板上放出该层平面控制轴线。待竖向钢筋绑扎完成后,在每层竖向筋上部标出标高控制点。1、机具准备1)、剥肋滚压直螺纹机械连接机具由该项技术提供单位配备。高峰期钢筋施工时至少保证5台钢筋剥肋滚压直螺纹机,其技术参数如下表示:设备型号 GHG40型滚丝头型号 40型可加工范围 16~40整机质量(kg) 5902)限位挡铁:对钢筋的夹持位置进行限位,型号划分与钢筋规格相同。3)螺纹环规:用于检验钢筋丝头的专用量具。4)力矩扳手力矩扳手精度为±5%5)辅助机具砂轮切割机:用于钢筋端面整平用于检验钢筋丝头的专用量具6)、钢筋焊接机具电焊机、控制箱、焊接夹具、焊剂罐等焊接电流:焊接电源400~450A;施工手续现场钢筋工人员必须佩戴上岗证,焊工必须有岗位资格证(有效)参加钢筋机械接头加工人员必须进行技术培训,经考试合格后方可执证上岗。未经培训人员严禁操作设备。钢筋连接及锚固要求A.竖向钢筋D≥18mm,采用电焊压力焊;横向D≥18mm采用机械连接;D<18mm用搭接。B.相关要求(1)钢筋锚固必须符合GB5001-2002的规定,提供参考值如表:名称部位 锚固长度 末端弯钩长度 d<25 d≥25 基础DL 35d ≥10d底板 35d 40d ≥10d墙柱插筋 直接插至底板下表面 ≥10d(2)钢筋搭接长度必须符合GB50010-2002或按GB50204-2002附录B:纵向受力钢筋的最小搭接长度(3)机械连接接头按加工标准,见项所述钢筋的加工钢筋加工的形状、尺寸必须符合设计要求:A.钢筋调直采用冷拉方法进行钢筋调直,I级钢筋冷拉率为4%,由于钢筋加工区场地有限,钢筋冷拉长度为27m,冷拉后为;钢筋冷拉采用两端地锚承力,标尺测伸长,并记录每根钢筋冷拉值。B.钢筋弯曲1)钢筋弯钩或弯折:I级钢筋末端做180°弯钩,其圆弧弯曲直径(d为钢筋直径),平直部分长度为3d;Ⅱ级钢筋做90°或135°弯折时,其弯曲直径为4d。2)箍筋末端的弯钩:I级钢筋弯钩的弯曲直径≥受力钢筋直径或箍筋直径的倍,弯钩平直长度为箍筋直径的10倍,弯钩角度45°/135°。C.焊接接头1)施焊前检查设备、电源,随时处于正常状态,严禁超荷工作;2)钢筋安装之前,焊接部位和电极钳口接触的(150mm区段)钢筋表面的锈斑、油污、杂物等,应清除干净,钢筋端部若有弯折、扭曲,应予以矫直或切除,但不得锤击矫直。3)选择焊接参数主要参数为:焊接电流,焊接电压和焊接通电时间(参见施工工艺标准)。焊剂应存放于干燥的库房内,防止受潮。如受潮,便用前须经250~300℃烘焙2小时,并进行记录。D.机械连接 钢筋端面整平→剥肋滚压螺纹→丝头质量检查→带帽保护→丝头质量抽检→存放待用。b.操作要点钢筋端面平头:采用砂轮切割机平头(严禁气割),保证钢筋端面与母材轴线垂直。剥肋滚压螺纹:使用钢筋滚压直螺纹机,将待加工钢筋加工成直螺纹;丝头质量检查:对加工的丝头进行质量检验(按以上丝头设计表);带帽保护:用专用的钢筋丝头塑料保护帽进行保护,防止螺纹损伤;丝头定量抽检:项目部质检部组织自检,存放待用:按规格型号及类型进行分类码放。钢筋绑扎及安装(1) 底板、基础梁钢筋防水保护层上放线,基础标高放线→搭设梁脚手架→南北向梁上铁放置、绑扎→东西向梁上钢筋放置、绑扎→放南北向梁箍筋→放置三道柱箍→东西向板梁钢筋下铁放置、绑孔→南北向板梁下铁放置、绑扎→放置底板、基础梁垫块→拆除基础梁脚手架→调整基础梁位置→墙柱插筋放线→放置墙柱插筋并临时固定→放置三道墙体水平筋→底板上铁标高放线→放置马凳→南北向底板上铁放置、绑扎→东西向底板上铁放置、绑孔→调整、固定墙柱插筋。a.底板、基础梁钢筋排列顺序为:东西向筋上铁在上,下铁在下;南北向钢筋在东西向钢筋中间;若基础梁上下铁不只一排,东西向筋与南北向钢筋交错布置;b.底板钢筋的弯钩,下排均朝上,上排均朝下;c.钢筋网的绑扎:所有钢筋交错点均绑扎,而且必须牢固;同一水平直线上相邻绑扎成“八”字型,朝向混凝土内部,同一直线上相临绑扣露头部分朝向正反交错;d.箍筋接头(弯钩叠合处)沿受力方向错开布置,箍筋转角与受力筋交叉点均应扎牢,绑扎箍筋时绑扣相互间应呈“八”字形 本工程主要是防护墙及顶板的支模及混凝土的浇筑,要确保混凝土的密实度防止射线泄漏, 防护墙、顶板模板在施工中的稳定性做到不变形、胀板。其它辅助用房按常规工程施工方法便可。 ⑴ 模板安装及支撑工程 本工程防护墙厚度有 、,高度、,为了保证工程需要,采用支模方法如下:模板采用20mm 厚竹胶合板、横档用80× 80 枋木间距400mm,拉丝及内撑均用Ф 16钢螺丝两用/ 梅花状 × 一道作为墙体拉结、墙体高度在 米以上拉丝间距可墙大至 × 一道,立档采用宽160mm 槽钢、间距600,经计算防护墙体的侧压力在高 米以下为,因此,斜支撑需用200mm 槽钢间距为1200。立柱水平拉杆用40 × 40 角钢、十字交叉拉结。同时,在墙体转角位置由于拉丝不能固定,立档及斜撑槽钢按外侧壁的间距加密一倍安装。 为保证F 轴防护墙外侧模板的平整、垂直,除了在墙体用钢螺栓拉结外,在地梁上预埋Ф 16a1200 钢筋,作水平拉结,防止斜撑滑移。 ⑵ 顶板模板有支撑 本工程的顶板厚度不同, 梁部X 机房厚500,60CO 机房1000、直加机房2500,经计算,直加机房顶板的最大荷载重是65800N/m 2, 因此, 对模板、杉木支撑的要求很高, 为保证其模板的稳定生刚性, 采用支模如下。 模板为20mm 竹胶合板,下用80 × 80 枋木拼密。 模枋条用工字钢1 2 # , 固定在支顶上。 支顶用Ф 108 无缝钢管。间距800mm。顶板厚度为 — 米的支撑,间距可增大到1 米。 为确保整体稳定性, 防护墙、枯板部分的模板均采用满堂红支顶一次成型,互成连整体 外加剂:设计无具体要求,通过分析比较及过去在其它工程上的使用经验,每立方米混凝土2kg,减水剂可降低水化热峰值,对混凝土收缩有补偿功能,可提高混凝土的抗裂性。具体外加剂的用量及使用性能,商品混凝土站在浇筑前应报告送达施工单位4.外加剂的合理选择外加剂:设计无具体要求,通过分析比较及过去在其它工程上的使用经验,每立方米混凝土2kg,减水剂可降低水化热峰值,对混凝土收缩有补偿功能,可提高混凝土的抗裂性。具体外加剂的用量及使用性能,商品混凝土站在浇筑前应报告送达施工单位(1)选择水泥。选用杭州水泥厂水化热较低的#425矿渣硅酸盐水泥。其早期的水化热与同龄期的普通硅酸盐水泥相比,3d的水化热约可低30%。 (2)掺加磨细粉煤灰。在每立方米混凝土中掺加粉煤灰75kg,改善了混凝土的粘聚性和可泵性 ,还可节约水泥50kg。根据有关试验资料表明,每立方米混凝土的水泥用量每增减10kg,其水化热引起混凝土的温度相应升降1~℃,因此可使混凝土内部温度降低5~6℃。 (3)选用优质外加剂。为达到既能减水缓凝,又使坍落度损失小的要求,经比较,最后选用了上海产效果明显优于木钙的—2型缓凝减水剂,可减少拌和用水10%左右,相应也减少了水泥用量,降低了混凝土水化热。 (4)充分利用混凝土后期强度。实践证明,掺优质粉煤灰混凝土后期强度较高,在一定掺量范围内60d强度比29d约可增长20%左右。同时按《粉煤灰混凝土应用技术规范(GBJ 146— 90 )》,地下室内工程宜用60d龄期强度的规定。为了进一步控制温升,减少温度应力,根据结构实际承受荷载情况,征得设计单位同意,将原设计混凝土28d龄期C30改为60d龄期C30(即用28d龄期C25代替设计强度),这样可使每立方米混凝土的水泥用量减少50kg,混凝土温度相应随之降低5~6℃。5.高温条件下的混凝土浇筑质量1.,考虑高温和远距离运送造机坍落度18±2cm, 水泥用量控制在370kg/以下。由于降低水泥用量可降低混凝土温度16~18℃。 成的坍落度损失较大,取出2. 用原材料降温控制混凝土出机温度 根据由搅拌前混凝土原材料总热量与搅拌后混凝土总热量相等的原理,可求得混凝土的出机温度T,说明混凝土的出机温度与原材料的温度成正比,为此对原材料采取降温措施:①将堆场石子连续浇水,使其温度自浇水前的56℃降至浇水后的29℃ ,且可预先吸足水分,减少混凝土坍落度损失;②黄砂在钱塘江码头起水时,利用江水淋水冷却,使之降温。③虽混凝土中水的用量较少,但它的比热最大,故在搅拌混凝土用的3只贮水池内加入冰块,使水温由31℃降到24℃,总共用去冰块75t。这样一来,经计算出机温度T为℃,37次实测的平均实测值℃,送达现场的实测温度为℃,从而使入模温度大为降低。 3 保持连续均衡供应控制混凝土浇筑温度 (1)为了紧密配合施工进度,确保混凝土的连续均匀供应,经过周密的计算和准备,安排南星桥和六堡两个搅拌站同时搅拌,配备了18辆搅拌车和两只移动泵,在三天四夜里始终保持了稳定的供应强度,基本上做到了泵车不等搅拌车,搅拌车不等泵车,未发生过一次由于相互等待而造成堵泵现象。 (2)本工程基坑挖深,坑内实测最高气温达62℃,为避免太阳直接暴晒,温度过高,造成浇筑困难,采取在整个坑顶搭盖凉棚,并安设了通风散热设施,使坑内浇筑温度大幅度降低,接近自然气温,不仅控制了最高温升,而且改善了工人劳动条件,得以顺利浇筑。 3)为不使混凝土输送管道温度过高,在管道外壁四周用麻袋包裹,并在其上覆盖草包并反复淋水、降温。 (4)考虑混凝土的水平分层浇筑装拆管道过于频繁,施工组织工作难于实施,故采取斜面分层浇筑,错开层与层之间浇筑推进的时间以利下层混凝土散热,但上下层之间严格控制,不得超过混凝土初凝时间,不得出现施工“冷缝”。由于泵送混凝土的浆体较多,在浇筑平仓后用直尺刮平。约间隔1~2h,用木蟹打压两次,以免出现表面收水裂缝。4 加强混凝土保湿保温养护 混凝土抹压后,当人踩在上面无明显脚印时,随即用塑料薄膜覆盖严实,不使透风漏气、水分蒸发散失并带走热量。且在薄膜上盖两层草包保湿保温养护,以减少混凝土表面的热扩散 , 延长散热时间,减少混凝土内外温差。经实测混凝土3天内表面温度在48~55℃之间,且很少发现混凝土表面有裂缝情况。 5 通过监控及时掌握混凝土温度动态变化 (1)温度监控的最终目的是为了掌握混凝土内部的实际最高温升值和混凝土中心至表面的温度梯度,保证规范要求的内部与表面的温差小于25℃及降温速率。 (2)温度是直接关系整个混凝土基础质量的关键。为了客观反映混凝土温度状况,进行原材料温度 、出机温度、入模温度、自然温度、覆盖养护温度、混凝土内部温度、棚内温度等7个项目的测试,便于及时调整温控措施。(3)主楼基础的混凝土温度按不同平面部位和深度共布置了25个测点(图1),由专人负责连续测温一周,每间隔2h测一次,比规范规定每8h测2次的频度要大些。效果及结论 (1)混凝土强度按《混凝土强度检验与评定标准(GBJ 107-87)》进行了测试,有关结果 如表1,属合格。(2)由于采用了“双掺技术”(缓凝减水剂和磨细粉煤灰),延缓了凝结时间,减少了坍落度损失,改善了混凝土和易性和可泵性。使得混凝土在高温、远距离运送条件下仍能顺利泵送 ,也未发生堵泵。 (3)混凝土出机温度和入模温度共实测37次,原材料温度测试20次,混凝土内外温度连续测一周,混凝土中心最高温度出现在浇注后的3~4d之间,与文献介绍的一致。内外温差仅为1 5℃,且低于规范规定不得大于25℃的要求。 (4)经各有关单位的严格检查和近年来的使用,未发现有害裂缝(仅表面有个别收水裂缝)。 混凝土密实平整光洁,无蜂窝麻面

[论文关键词]现浇混凝土结构裂缝 原因 防治[论文摘要]现浇钢筋混凝土结构裂缝是施工中一个带有普遍性的问题。它不仅有损外观整体性,降低刚度。所以很有必要对裂缝进行鉴别、分析和控制。一、钢筋混凝土现浇结构收缩裂缝为保证操作需要的稠度,混凝土加入的水分往往比水泥水化作用需要的水分多4~5倍,这部分多余的水蒸发后会产生体积收缩,一般称为湿度收缩。另外水泥水化作用也会引起体积收缩,称为自收缩。施工中常见的混凝土收缩有塑性收缩裂缝、沉降收缩裂缝、干燥收缩裂缝。(一)塑性收缩裂缝一般出现在干热或刮风天气,形状像干燥泥浆面。裂缝多为中间宽两端渐细且长短不一、互不连贯。产生的主要原因是混凝土在塑性状态时表面水分蒸发过快,产生了急剧的体积收缩,从而导致混凝土表面裂缝。而蒸发速度的快慢和风速、相对湿度、混凝土表面空气湿度以及自身的温度有关。风速越大,温度越高,水分蒸发速度越快。防止产生这种裂缝的有效方法是:尽可能减少混凝土表面与内部的相对体积变化的差异。混凝土浇灌后及时覆盖,洒水养护;严格控制混凝土配合比;将基层和模板浇水均匀湿透;对高温、大风天气施工的混凝土应及时抹压,防止裂缝继续产生。(二)沉降收缩裂缝多沿主筋通长方向上在混凝土表面断续出现。或在相邻断面显著变化部位出现,裂缝较浅较宽。常在混凝土浇灌后发生、硬化后停止。产生的原因为混凝土浇捣后骨料颗粒沉落,水分上升,受到钢筋或埋设件或大的粗骨料阻挡,而使混凝土互相分离,或混凝土本身组成材料沉落不均造成开裂,斜面上的混凝土由于重力向下流动而开裂。为防止这类裂缝,可采用稠度适当的低流动性混凝土加强捣实;对断面相差较大的结构物先浇深部位2~3 h后再与薄断面一起浇灌。(三)干燥收缩裂缝多发生在混凝土终凝前后。裂缝为表面的,较浅较细,沿短向分布。随着湿度和气温的变化,由表及里,由大到小逐渐发展。产生的原因主要是混凝土养护不到位,风吹日晒,表面水分散失过快而内部湿度变化小,表面干缩变形受内部混凝土的约束,产生较大的拉应力而引起裂缝。为防止这类裂缝,可采取严格控制混凝土的水灰比、砂率、砂石含泥量;加强早期覆盖和养护适当延长养护时间;密封保水养护对长期露天堆放的构件采取适当洒水养护。二、温度裂缝混凝土受温度影响,会产生热胀冷缩变形。当变形变化不均受到约束,便会产生应力导致裂缝。(一)内约束裂缝由于混凝土内外温差过大引起的。从理论上计算,混凝土表面温度骤降超过5~7度就有可能引起裂缝。多发生在早期,通常只在混凝土表面出现。控制这类裂缝的方法,在于控制混凝土内外温差,防止表面急剧冷却,冬季采取保温、缓拆模;加热养护严格控制升降温度速度,温差不大于10度。(二)外约束裂缝由于平均降温过大引起的。大体积混凝土浇灌后,硬化期间水泥放出大量水化热,内部温度上升很高,散热慢,表面散热快,内外温差在表面引起拉应力;后期降温冷却时,当受到其他约束,又会在内部出现拉应力,当应力超过混凝土抗拉强度时,便出现裂缝。控制这类裂缝的方法有采用低热水泥;改善骨料级配;拌合水掺冰屑,对砂石冷却;合理安排工序进行薄层浇灌;预留孔洞;合理分缝分块。三、沉降裂缝多为深进的或贯穿性的,其位置与深陷方向一致,较大的沉陷裂缝往往有一定错位,裂缝宽度与沉降值成比例。产生的原因是结构构件落在未经加强处理的回填土或松软地基上,混凝土浇灌后,因地基浸水引起不均匀沉降而导致裂缝,特别是平卧生产的薄形构件。再有模板刚度不够,支撑间距过大或底部松动以及拆模过早,也常导致这类裂缝。 控制这类裂缝方法是,避免直接在松软土上制作构件;保证模板有足够刚度和强度,支撑牢固;作好周围排水,防止浸泡地基;拆模时间和顺序要按规定进行。四、地基不均匀沉降产生的裂缝由于地基沉降不均匀引起梁板裂缝。不均匀沉降产生的裂缝多属贯穿性裂缝,其走向与沉降情况有关,一般表现为垂直或是呈30~40°角方向发展。防止这类裂缝产生的方法是,地基必须进行认真勘测,充分掌握地基下的土质特征,如果遇到软弱土层,应对地基进行处理,保证地基满足设计要求,同时还应当注意基础周围的排水情况,防止地面水浸泡基础下的土层。五、结束语为了尽可能防止混凝土结构裂缝产生,需要不断提高设计施工质量,把好原材料质量关,采取有效措施,提高混凝土结构的耐久性,加强对建筑物的使用管理,避免随意增加荷栽,莫忘经常性的维护和维修工作,以延长建筑物的使用寿命。参考文献:[1]《建筑工程常见病多发病防治》,河南科学技术出版社.[2]金毳鸣,《浅谈钢筋混凝土楼板的裂缝产生原因和防治措施》.

混凝土工程6.1混凝土施工采用现场拌制。6.2梁浇筑:浇筑梁时,应先在基槽两侧板上弹出标高线,以控制标高尺寸。连续的独立柱基梁,要求一次浇筑完毕,不得留设施工缝,保证混凝土的浇捣在纵向的搭接时间不超过初凝时间,为确保工程质量,安排管理人员跟班。6.3浇筑砼注意事项a、振动棒插点按梅花形插入,间距300-500左右。振捣时,要“快插”“慢拔”,以防止混凝土表面先振实,而下面混凝土发生分层、离析现象及防止快拔时,砼来不及补充,留下空间。振动棒插入混凝土后应上下抽动,幅度5-10cm,以排除砼中空气。b、振动时视砼表面呈水平不再下沉,不再出现气泡,表面泛出灰浆水宜约20-30S。c、振捣时振动棒不宜紧靠模板,且应尽量避免振动棒碰撞模板、钢筋,予埋件,以防止跑模、钢筋位移等。d、当混凝土分层浇筑时,振捣上一层砼时,应插入下一层中50mm左右,以消除两层之间的接缝。浇捣砼后,需外露钢筋必须随时清理干净,落下砼及其模板根部水泥浆应及时清理。6.4试块制作:每台班留置试块两组,一组标养,一组同条件养护(累计温度达到600度时送试)。6.5施工缝留置严格按GB50204-2005规范执行,其中楼梯施工缝留置在跨中的1/3处。

相关百科